Entries by Christa

landmark movable bridge completed

The iconic Michiel de Ruyter Bridge has been completed! This movable bridge has many faces and will in future be the main entrance to the Zeeheldenwijk housing development in the Dutch village of Urk. When opened, tower and counterweight resemble the shape of a netting needle, which refers to the main characteristic of the fishing village.

design study for replacement of 40+ Belgian bridges

The Flemish government selected around 40 bridges that they want to have replaced by 2030. A consortium of Arcadis, SBE and Tractebel was recently commissioned to prepare this large-scale replacement operation. The consortium has asked ipv Delft to help them create a manual outlining the desired design quality for the new bridges.

architectural design for interchange Brussels

The SPI.R0 consortium, in which Belgian contractors Jan De Nul and Willemen Infra join forces, has been appointed as the bidder of preference for the large-scale refurbishment of the R0xA201 motorway interchange in Brussels. Within the project, we are responsible for the architectural design of all infrastructural structures, such as bridges and bicycle underpasses.

final design Zwolle train station footbridge completed

An attractive public park, 130 by 10 meters in size, located right above the railway tracks, with a unique fully timber bridge deck. In a nutshell, that’s the sustainable and green footbridge at Zwolle train station. It is with pride that ipv Delft, Karres en Brands (coordinating architect) and German Ingenieurbüro Miebach now present the final design.

new download: the Dutch Bridge brochure

We recently posted a new download: a brochure dedicated to our system of standardised movable bridges, The Dutch Bridge. This all-in-one solution for well-designed movable bridges significantly simplifies and speeds up both the initiation and building process, reducing building time and building costs.

Footbridge Conference 2022

This Wednesday to Friday we will be attending the Footbridge Conference in Madrid. Two of our designers will share our expertise during two consecutive lectures.

LA River project continues

Our work for the LA River bike path gap closure project has now entered the next phase. We have started working on the preliminary designs for all built structures necessary along the 8-mile stretch of new bicycle path. This includes elevated bicycle paths, underpasses and bridges. The project is located in LA’s most densely built-up […]

Perth bridges in contract procurement phase

The Western Australian government is currently looking at local companies’ expressions of interest for the final design and construction alliance contract procurement for the Swan River bridges in Perth. Shortlisted proponents will be invited to submit a request for proposals in about two months time. Our design for the two bicycle and pedestrian bridges was […]