design study for replacement of 40+ Belgian bridges
The Flemish government selected around 40 bridges that they want to have replaced by 2030. A consortium of Arcadis, SBE and Tractebel was recently commissioned to prepare this large-scale replacement operation. The consortium has asked ipv Delft to help them create a manual outlining the desired design quality for the new bridges.