De Patriot bridge, bicycle bridge in Abbenes

giving a bridge a fourth life

Rijkswaterstaat will replace one bridge and three viaducts along the A44 between now and 2030. One of these viaducts crosses the Hoofdvaart near Abbenes. Directly beneath it is a road bridge that will be demolished as part of the works. Until then, cyclists and motorists share the same narrow and poorly lit crossing, an unsafe situation. The Municipality of Haarlemmermeer initially planned to build a temporary bicycle bridge for the duration of the works, but the idea evolved into a new permanent bicycle bridge at this location.

a second-hand bridge

Circularity is an explicit ambition of the Municipality of Haarlemmermeer and became the starting point for this design. The municipality acquired a former harbour bridge from Vlissingen through the Bruggenbank, a marketplace for reusable bridges. The 26-metre-long truss bridge was still in good structural condition. Our task was to transform it into a fitting and attractive bridge for its new location.

reusing the steel structure

The truss bridge had previously been extended and strengthened with box girders above and below the structure. These steel box sections were removed, restoring the bridge to a pure truss structure.

The bridge also needed to be slightly longer so that the abutments could be positioned as far as possible within the embankments, preserving the profile of the Hoofdvaart. The removed steel box sections were reused as supports and short approach spans on either side, providing exactly the additional length required.

An additional railing was installed on top of the truss structure to achieve the required height of 1.3 metres. At the ends, it transitions into a full-height railing with horizontal steel tension cables. This clearly distinguishes the new additions from the reused bridge structure while maintaining a coherent overall appearance.

The bridge has a unified appearance thanks to its continuous edge beam. The lower horizontal truss member transitions seamlessly into the approach spans and abutments.

details and history

The tension cables of the new railing continue alongside the truss structure. The design incorporates carefully detailed steel eyes through which the cables pass. Lighting has been integrated into the new handrail, ensuring the bridge is well lit after dark.

The bridge is named De Patriot, after a resistance group and underground newspaper that operated in the area during the Second World War. Three members of the resistance were executed on 8 September 1944.

The poem Hoofdvaart by Leo Richardson is featured on the inside of the original bridge structure. Next to the bridge, an information column made from steel left over after construction tells the story of the bridge’s origin and reuse. A QR code provides access to additional information.

reuse is the future

This is the first time we have reused an entire bridge structure. Compared to a new steel bridge, the reduction in both CO₂ emissions and ECI is substantial. Reusing the truss structure results in a 69% reduction in CO₂ emissions and a 68% reduction in ECI.

In addition, the abutments were constructed using cement-free concrete, further reducing environmental impact. Together, these measures make De Patriot an exceptionally sustainable bridge and a project that perfectly reflects our commitment to sustainability.

specifications

partners: Dura Vermeer, Haskoning, Vic Obdam
completion: 2026

more information?

call Ronald Rozemeijer:
+ 31 15 750 25 71

project team

Ronald Rozemeijer
Denis Bacal

similar projects