side view bridge Fortmond Olst, bridge design by ipv Delft

submersible bridge nominated for Concrete Award

The submersible Fortmond bridge is one of the nominees for the Betonprijs, the Dutch Concrete Awards. The jury praised its 6 week construction time and the fact that the bridge is designed to serve nature.